This session will focus on the behaviour of post-install rebar connections in concrete structures under fire conditions (From Theory to Profis)
Fire design is a critical but often overlooked aspect of post-installed rebar connections in the region. While the UAE Fire and Life Safety Code and the Saudi Building Code (SBC) reference fire performance requirements for structural connections, these provisions are largely oriented toward cast-in solutions. As a result, post-installed rebar is often left without clear design guidance. In this webinar, we will examine how post-installed rebar behaves under fire conditions, walk through the End Anchorage design using TR069 and Eurocode 2, and close with a live demonstration of Hilti PROFIS Engineering.
Sessions
|
1 Hilti CPD