- Home
- Business Optimization
- Solutions
- Engineering Solutions
- Post Installed Rebar
- Post-Installed Rebar Jobsite References
JOBSITE REFERENCES
Working on post-installation rebar worldwide
At Hilti we don’t just make the adhesive and tools to make post-installed rebar work, but we also go out onsite and offer advice to some of the world’s most challenging and awe-inspiring builds.
We work on bridges that span huge rivers, delicate historical reconstructions and metro tunnels dug deep under major cities.
And we’re here to help. We have teams of specialist engineers worldwide who can help find solutions for your build, from the moment you start to design to throughout the process onsite.
Crevalcore School
Location -
Italy
Application -
Slab strengthening (overlays), Addition of shear walls using Hilti RE 500, SafeSet, Drill bits designed as per EC2-1-1, EC8-1
The Exchange 106
Location -
Malaysia
Application -
Floor slabs to core wall connections using Hilti RE 500, Drillers, Drill bits designed as per the Hilti method
Tin Can Island
Location -
Nigeria
Application -
Slab Strengthening (Concrete Overlay) of dock platform using Hilti RE 500 V4, Drilling tool TE 6, HDE 500 designed as per EOTA TR 066, EC2-1-1
Al Habtoor Towers
Location -
Emirates
Application -
Strengthening of basement, walls & columns of 85 floors tall tower using Hilti HIT-RE 500, HDE Dispensers, TE-YX Drill bits, Corded and Cordless fleet + setting tools, HKD short anchors, Hilti Scanners PS 85, PS 250 designed as per EOTA TR 069, EC2-4